The office complex is designed in compliance with A-class office standards – modern and ecological materials, nature-friendly and energy-efficiency increasing technologies are used.
The reinforced concrete inner walls and columns are painted. The corridor partitions, conference rooms are constructed from aluminium-glass structures. The "open space" without additional partitions is used as inner layout. WC and kitchens walls are implemented using plasterboard and rock wool.
Windows are from heat-insulating glass, selective glass-aluminium constructions with internal curtains. Aluminium-glass design is used with the heat insulating three-chamber glass packages, Rw - 41 dB, the glass heat transfer coefficient U = 0.5-0,6 W / m2K; light transmittance of 60%; Light reflectance LR-18%. (A class energy efficiency)
Heating
Independent heating unit with a microprocessor-based control and automation, mounted steel radiators (Purmo or analogy) with manual thermostats. The maximum heat output of 1.35 MW is available, required for heating - 220 kW
Ventilation
Independent centralized, mechanical air supply and extract with heat recuperation (class A energy efficiency) ventilation system with two-stage AMALVA the F5-F7 air cleaning, high efficiency ventilation system with a microprocessor-based control. Air output 8.0 to 8.5 m³ / h / m², acoustic noise no more than 36 dBA. Shut-off valves in each floor, automatic electromagnetic valves.
Conditioning
Independent for each floor LG Electronics cooling system VRF with a microprocessor-based control. Installed cooling capacity - 80-100 W / m², acoustic noise no more than 36 dBA. Cooling devices are equipped with balancing - control valves, control keypads. The consumed cold is estimated based on the automated readings of the electricity meters.
Entrance - automated programmable access control system, alarm system. The entrance to the underground and ground car parking using control cards or remote control, installed turnstiles and lift garage door. Video surveillance inside and outside the building according to the project is installed.